Istiklal Street (End of Fez ramp)
We have completed the asphalt road renovation works on İstiklal Street (end of Fez ramp) and its continuation, Şht. Bayram Özgün Street (end of ramp – beginning of Lesland road), one of the busiest main arteries of Çatalköy, with a total length of 1,055 meters and a width of 7.10 meters. The project also included:
• 2,200 meters of sidewalk renovation,
• 50 meters of retaining wall construction,
• 1,200 meters of new rainwater drainage infrastructure work,
• 1,300 meters of drinking water line renovation. We thank all our citizens for their patience and understanding during the works.
• 2,200 meters of sidewalk renovation,
• 50 meters of retaining wall construction,
• 1,200 meters of new rainwater drainage infrastructure work,
• 1,300 meters of drinking water line renovation. We thank all our citizens for their patience and understanding during the works.
Tarih Sırası
Timeline

2026
İlk Çalışma
Çalışmalar Başlatıldı

İşaat Devamı
Çalışmalarımız devam ediyor

2026
Tamamlandı
• 2.200 metre kaldırım yenileme, • 50 metre istinat duvarı yapımı, • 1.200 metre yeni yağmur suyu drenaj altyapı çalışması, • 1.300 metre içme suyu hattı yenileme çalışması gerçekleştirilmiştir.